Skip to content
Rain running down the pans of a corrugated roof into a gutter full of gum leaves, water spilling over the fascia.

We go up before we quote.

Re-roofs, restorations and repairs on pitched roofs across Adelaide's eastern suburbs and the Hills face: corrugated steel, terracotta and cement tile, and slate, with new gutters, downpipes and skylights. Nothing's finished until we've run the gutters with a hose.

Move the rain. That gutter's full of leaves. Click it.Drag to move the rain. Tap the gutter. Arrows move the rain, C clears the gutter, R changes the roof.

What we find up there

You can't quote a roof from the driveway. So we get the ladder out, walk the whole thing, and come down with photos of what we saw.

Rust at the laps.

Water hangs longest where one sheet sits over the next, so that's where steel goes first. Surface rust we treat. Rust a screwdriver goes through means new sheets.

Lap: the overlap of one sheet or tile on the next.

A cracked ridge.

The caps along the top sit on mortar, finished with pointing. When it cracks, the caps rock and rain gets under. We re-bed and re-point the run, not just one cap.

Pointing: the flexible strip holding the caps.

A gutter falling the wrong way.

A gutter needs a slight fall to its downpipe. Some settle back, water sits and the steel goes. We re-hang it on the right fall and prove it with a hose.

Fall: the slope a gutter drains on.

A slipped slate.

It's usually the nail that's gone, not the slate. We slip a new one in and hold it with a copper tingle.

Tingle: a strip that hooks a slate in place.

A valley rusted through.

Where two slopes meet, the valley carries the most water, so it's often the first thing we replace.

Valley: where two slopes drain together.

We'll show you the photos before we talk about fixing anything.

Gloved hands driving a screw through the crest where two steel sheets lap, a harness lanyard and an edge rail in view.
Screws go through the crest, never the pan. The pan is where the water runs.
A re-laid terracotta roof with new pointing on the ridge, wet after rain, the Hills face in cloud behind.
A terracotta roof re-laid and re-pointed, the morning after rain.

Three roofs, and what each one wants.

Steel

Corrugated steel lasts well if the laps and screws are looked after. We replace rusted sheets, screw on the crest (never the pan, where the water runs), and re-sheet the whole roof when it's time.

Tile

Terracotta and cement tile. Tiles outlast their pointing and their valleys. We replace cracked tiles, re-bed and re-point ridges, and re-lay course by course when the battens underneath have had it.

Slate

Slow, careful work: slipped slates, rusted nails, worn valleys. We match what's there and keep as much of the old roof as is sound.

Press a profile and the rain at the top of the page runs over that roof instead.

Off, down to the battens, and back on.

Rafters

Battens

Sarking

The sheeteach course laps the one below

The flashing

The cap

Then we run the gutters with a hose. That's when it's finished.

  1. Rafters

    Off first, down to the frame. We look at what's there before we decide anything.

  2. Battens

    The timber strips the roof is fixed to. Rotten ones come out, and new ones go in at the right spacing.

  3. Sarking

    A membrane under the roof. It catches what gets past, and cuts heat and dust.

  4. The sheet

    Steel, tile or slate back on, each course lapping the one below, fixed where it should be.

  5. The flashing

    Folded steel where the roof meets a wall or chimney, so water is turned away, not let in.

  6. The cap

    The ridge capping over the top: bedded and pointed on tile, screwed down on steel.

A new steel valley running between two cement tile roof slopes, rain tracking down its centre.

Most leaks start where two roofs meet.

Valleys
The busiest channel on the roof, so we replace them in one length, not patched.
Flashings
Where a roof meets a wall or chimney, folded and turned up, not smeared with sealant.
Skylights
A new skylight puts daylight down a dark hallway, and we flash it in the same way so it stays dry.
A villa hallway on a rainy day, daylight falling from a new skylight onto the floorboards.

From the room below.

Steel rings. Tile clicks. Slate hushes. A blanket under any of them takes the edge off. Pick a roof and listen.

  • Steel rings. You hear each drop, then the sheet hums a little after it.
  • Tile clicks. Short, dull taps; heavy rain becomes a roar without a ring.
  • Slate hushes. A soft patter, like rain on a coat.
  • A blanket under any of them takes the top off and shortens every drop.

Synthesised on this page from noise and filters, not a recording.

Will your gutters keep up?

180
Downpipes
2
How hard it's raining

Rainfall figures are illustrative. A garden hose is taken as 20 litres a minute.

About 225 litres a minute into each of your 2 downpipes.

That's roughly 11 garden hoses running into each one.

The more that goes into one downpipe, the less room a gutter with leaves in it has. Another downpipe, or a bigger outlet, spreads the load.

Whatever we do to a gutter, we finish by running it with a hose and watching where the water goes.

The eastern suburbs, up to the Hills face.

  • Norwood
  • Kensington Park
  • Beaumont
  • Burnside
  • Glen Osmond
  • Leabrook
  • Tusmore
  • Linden Park
  • Stonyfell
  • Wattle Park
  • Magill
  • Rostrevor
  • Teringie
  • Auldana
  • Skye
  • Waterfall Gully
  • Crafers
  • Stirling
  • Aldgate
  • Norton Summit
  • Summertown
  • Greenhill

If you can see the Hills face from your gutter, we probably come to you.

Ask us up.

Tell us what you've noticed. We'll come and get up there before we say a word about cost.

Just the suburb.
Your roof
A phone number or an email, whichever suits